Concrete Yield Verification Calculator
Compare measured yield with expected volume.
Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources
Concrete Yield Verification Inputs
Bags & Mix DesignFormula: Actual yield = batch mass ÷ unit weight ÷ 27 (ASTM C138); relative yield = actual ÷ ordered.
Estimated Result
- Relative yield
- 1.009
- Over / under
- 0.09 yd³
How the Concrete Yield Verification Calculator Works
The Concrete Yield Verification Calculator compares measured yield with ticketed volume.
- 1
Enter ticket volume
Enter yardage on the ticket.
- 2
Enter batch weight
Enter total batch weight from the ticket.
- 3
Enter measured unit weight
Enter the field unit weight test.
- 4
Read variance
Read measured yield and % over or under.
Concrete Yield Verification Calculator Formula
Yield variance equals (measured yield − ticket volume) ÷ ticket volume.
- Measured yield
- Ym (yd³) = ΣW ÷ γ ÷ 27
- Variance
- Δ% = (Ym − Vt) ÷ Vt × 100
- Review threshold
- Investigate when |Δ%| > 2%
Worked example: A 10 yd³ ticket at 39,500 lb with a measured unit weight of 147 lb/ft³ yields 9.95 yd³, a -0.5% variance.
Field tip: Run 3 unit weight tests from different trucks before claiming a short yield.
Concrete Yield Verification Calculator Conversion Table
The table shows yield variance for a 10 yd³ (7.65 m³) load batched at 39,150 lb (17,758 kg).
| Measured γ (lb/ft³) | Yield (ft³) | Yield (yd³) | Variance (yd³) | Variance (%) |
|---|---|---|---|---|
| 141 | 277.7 | 10.28 | 0.28 | 2.8 |
| 143 | 273.8 | 10.14 | 0.14 | 1.4 |
| 145 | 270.0 | 10.00 | 0.00 | 0.0 |
| 147 | 266.3 | 9.86 | -0.14 | -1.4 |
| 149 | 262.8 | 9.73 | -0.27 | -2.7 |
What is the Concrete Yield Verification Calculator?
The Concrete Yield Verification Calculator is a check tool that tests whether delivered concrete matches the ticketed volume.
Short yield is a common placement dispute. A field unit weight test converts batch weight into actual delivered volume.
What are the uses of the Concrete Yield Verification Calculator?
There are 3 dispute-prevention uses of the Concrete Yield Verification Calculator, including short-yield claims and QC records.
Short-yield claims
Contractors document under-yield.
QC records
Testing labs log yield with strength samples.
Supplier review
Owners compare yield across suppliers.
Method, Review & Sources
The Concrete Yield Verification Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.
Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.
More Bags & Mix Design Calculators
View all 168 calculators →Concrete Bag Calculator
Estimate bag count using labeled yield.
Concrete Bags Per Cubic Yard Calculator
Convert bag yield into bags per yard.
Concrete Bags To Cubic Yards Calculator
Convert bag quantity into mixed volume.
Cubic Yards To Concrete Bags Calculator
Convert required yardage into bag quantity.
40-Pound Concrete Bag Calculator
Estimate bags using entered product yield.
50-Pound Concrete Bag Calculator
Calculate bags from labeled yield.