Continuous Strip Footing Inputs

Footings & Foundations

Formula: Volume = run × (width ÷ 12) × (depth ÷ 12) ÷ 27.

Estimated Result

6.79 yd³
Concrete volume (with waste)
Cubic feet
183.33 ft³
Cubic meters
5.19 m³
80-lb bags (0.60 ft³)
306 bags
60-lb bags (0.45 ft³)
408 bags
Per linear foot
1.39 ft³

How the Continuous Strip Footing Calculator Works

The Continuous Strip Footing Calculator multiplies the footing cross-section by its total run length.

  1. 1

    Measure total run

    Add every footing segment along the foundation centerline.

  2. 2

    Enter footing width

    Use 16 in to 24 in (41 to 61 cm) for residential walls.

  3. 3

    Enter footing depth

    Use 8 in to 12 in (20 to 30 cm).

  4. 4

    Read volume

    Read cubic yards and yardage per linear foot.

Continuous Strip Footing Calculator Formula

Strip footing volume equals centerline length × width × depth.

Perimeter (rectangle)
P = 2 × (L + W)
Centerline correction
Pc = P − 4 × footing width (outside dims)
Volume
V (ft³) = Pc × w × d
Yardage
V (yd³) = V ÷ 27

Worked example: A 40 ft × 28 ft house with a 20 in × 10 in footing measured outside has a 129.3 ft centerline and holds 6.65 yd³.

Field tip: Use centerline length. Adding outside dimensions counts each corner twice.

Continuous Strip Footing Calculator Conversion Table

The table lists strip footing yardage per 10 ft (3.05 m) and per 100 ft (30.5 m).

Width × depth (in)Section (ft²)Per 10 ft (yd³)Per 100 ft (yd³)Per 100 ft (m³)
12 × 80.6670.2472.471.89
16 × 80.8890.3293.292.52
16 × 101.1110.4124.123.15
20 × 101.3890.5145.143.93
24 × 101.6670.6176.174.72
24 × 122.0000.7417.415.66
30 × 122.5000.9269.267.08
36 × 123.0001.11111.118.50

What is the Continuous Strip Footing Calculator?

The Continuous Strip Footing Calculator is a linear footing tool that returns concrete volume for footings running under walls.

Strip footings spread wall loads along their full length. A 20 in × 10 in footing holds 0.051 yd³ per foot, so a 130 ft house perimeter needs 6.69 yd³ (5.11 m³).

What are the uses of the Continuous Strip Footing Calculator?

There are 4 foundation uses of the Continuous Strip Footing Calculator, including house perimeters and garden walls.

  • House perimeters

    Builders estimate footings under foundation walls.

  • Garden walls

    Masons size footings for block and brick walls.

  • Retaining walls

    Contractors price footings under short retaining walls.

  • Additions

    Crews total footing runs for room additions.

Method, Review & Sources

The Continuous Strip Footing Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.

Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.

More Footings & Foundations Calculators

View all 168 calculators →