Multiple Concrete Slabs Calculator
Add yardage across separate slabs.
Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources
Multiple Concrete Slabs Inputs
Slabs & FlatworkFormula: Each section = length × width × (thickness ÷ 12); sections are added, then divided by 27.
Estimated Result
- Cubic feet
- 143.73 ft³
- Cubic meters
- 4.07 m³
- 80-lb bags (0.60 ft³)
- 240 bags
- 60-lb bags (0.45 ft³)
- 320 bags
How the Multiple Concrete Slabs Calculator Works
The Multiple Concrete Slabs Calculator totals separate slabs into 1 combined order in 4 steps.
- 1
List every slab
Write each slab’s name, length, width, and thickness on 1 sheet.
- 2
Calculate each slab
Enter each slab’s dimensions and record its net cubic yards.
- 3
Add the volumes
Sum all net volumes before rounding.
- 4
Apply waste once
Apply 1 waste percentage to the combined total, then round to the supplier’s order step.
Multiple Concrete Slabs Calculator Formula
Combined yardage equals the sum of each slab’s length × width × thickness, divided by 27.
- Single slab
- Vᵢ (ft³) = Lᵢ × Wᵢ × (tᵢ ÷ 12)
- Combined
- V (yd³) = ΣVᵢ ÷ 27
- Order
- Order (yd³) = V × (1 + waste %)
Worked example: A 12 ft × 12 ft patio, a 40 ft × 4 ft walk, and a 6 ft × 6 ft pad, all at 4 in, total 4.20 yd³ net.
Field tip: Round only the final total. Rounding each slab up to 0.25 yd³ before adding inflates a 5-slab order by up to 1.25 yd³ (0.96 m³).
Multiple Concrete Slabs Calculator Conversion Table
The table builds a running total for a 5-slab residential order at 4 in (10 cm).
| Slab | Size (ft) | Volume (yd³) | Running total (yd³) | Running total (m³) |
|---|---|---|---|---|
| Patio | 16 × 12 | 2.37 | 2.37 | 1.81 |
| Walkway | 40 × 4 | 1.98 | 4.35 | 3.32 |
| AC pad | 4 × 4 | 0.20 | 4.54 | 3.47 |
| Shed base | 10 × 12 | 1.48 | 6.02 | 4.61 |
| Trash pad | 6 × 8 | 0.59 | 6.62 | 5.06 |
What is the Multiple Concrete Slabs Calculator?
The Multiple Concrete Slabs Calculator is a totaling tool that combines the yardage of 2 or more separate slabs into 1 order quantity.
One truck often serves several small pours on the same site. Combining slabs on 1 ticket avoids 2 short-load fees and 2 delivery charges.
What are the uses of the Multiple Concrete Slabs Calculator?
There are 4 ordering uses of the Multiple Concrete Slabs Calculator, including same-day pours and phased jobs.
Same-day pours
Crews place a patio, walk, and pad from 1 truck.
Phased jobs
Builders compare total yardage across 2 or 3 pour days.
Subdivision flatwork
Contractors total driveways and walks across several lots.
Material budgets
Owners price all slabs on a property at once.
Method, Review & Sources
The Multiple Concrete Slabs Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.
Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.
More Slabs & Flatwork Calculators
View all 168 calculators →Concrete Slab Yardage Calculator
Calculate volume from length, width, and thickness.
Square Concrete Slab Calculator
Calculate yardage for square slabs.
Circular Concrete Slab Calculator
Calculate volume from diameter and thickness.
Oval Concrete Slab Calculator
Calculate yardage for elliptical slabs.
Triangular Concrete Slab Calculator
Calculate volume from triangle area and thickness.
Trapezoidal Concrete Slab Calculator
Calculate yardage for trapezoidal slabs.