Skip to main content
Calculator Concrete Yards
Calculator Concrete YardsPro Volume Estimator
Slabs & Flatwork

Multiple Concrete Slabs Calculator

Add yardage across separate slabs.

Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources

Multiple Concrete Slabs Inputs

Slabs & Flatwork

Formula: Each section = length × width × (thickness ÷ 12); sections are added, then divided by 27.

Estimated Result

5.32 yd³
Concrete volume (with waste)
Cubic feet
143.73 ft³
Cubic meters
4.07 m³
80-lb bags (0.60 ft³)
240 bags
60-lb bags (0.45 ft³)
320 bags

How the Multiple Concrete Slabs Calculator Works

The Multiple Concrete Slabs Calculator totals separate slabs into 1 combined order in 4 steps.

  1. 1

    List every slab

    Write each slab’s name, length, width, and thickness on 1 sheet.

  2. 2

    Calculate each slab

    Enter each slab’s dimensions and record its net cubic yards.

  3. 3

    Add the volumes

    Sum all net volumes before rounding.

  4. 4

    Apply waste once

    Apply 1 waste percentage to the combined total, then round to the supplier’s order step.

Multiple Concrete Slabs Calculator Formula

Combined yardage equals the sum of each slab’s length × width × thickness, divided by 27.

Single slab
Vᵢ (ft³) = Lᵢ × Wᵢ × (tᵢ ÷ 12)
Combined
V (yd³) = ΣVᵢ ÷ 27
Order
Order (yd³) = V × (1 + waste %)

Worked example: A 12 ft × 12 ft patio, a 40 ft × 4 ft walk, and a 6 ft × 6 ft pad, all at 4 in, total 4.20 yd³ net.

Field tip: Round only the final total. Rounding each slab up to 0.25 yd³ before adding inflates a 5-slab order by up to 1.25 yd³ (0.96 m³).

Multiple Concrete Slabs Calculator Conversion Table

The table builds a running total for a 5-slab residential order at 4 in (10 cm).

SlabSize (ft)Volume (yd³)Running total (yd³)Running total (m³)
Patio16 × 122.372.371.81
Walkway40 × 41.984.353.32
AC pad4 × 40.204.543.47
Shed base10 × 121.486.024.61
Trash pad6 × 80.596.625.06

What is the Multiple Concrete Slabs Calculator?

The Multiple Concrete Slabs Calculator is a totaling tool that combines the yardage of 2 or more separate slabs into 1 order quantity.

One truck often serves several small pours on the same site. Combining slabs on 1 ticket avoids 2 short-load fees and 2 delivery charges.

What are the uses of the Multiple Concrete Slabs Calculator?

There are 4 ordering uses of the Multiple Concrete Slabs Calculator, including same-day pours and phased jobs.

  • Same-day pours

    Crews place a patio, walk, and pad from 1 truck.

  • Phased jobs

    Builders compare total yardage across 2 or 3 pour days.

  • Subdivision flatwork

    Contractors total driveways and walks across several lots.

  • Material budgets

    Owners price all slabs on a property at once.

Method, Review & Sources

The Multiple Concrete Slabs Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.

Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.

More Slabs & Flatwork Calculators

View all 168 calculators →