Concrete Delivery Interval Calculator
Estimate intervals from load size and placement rate.
Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources
Concrete Delivery Interval Inputs
Ordering & DeliveryFormula: Interval = load size ÷ placement rate × 60 minutes.
Estimated Result
- Loads per hour
- 2.00
How the Concrete Delivery Interval Calculator Works
The Concrete Delivery Interval Calculator sets truck spacing from load size and placement rate.
- 1
Enter load size
Enter yardage per truck.
- 2
Enter placement rate
Enter crew or pump rate in yd³ per hour.
- 3
Read the interval
Read minutes between trucks.
- 4
Send to dispatch
Give the interval to the plant.
Concrete Delivery Interval Calculator Formula
Delivery interval equals load size ÷ placement rate × 60.
- Interval
- T (min) = L (yd³) ÷ R (yd³/h) × 60
- Trucks per hour
- n = R ÷ L
- Rate check
- R = L × 60 ÷ T
Worked example: 10 yd³ loads at a placement rate of 30 yd³/h need a truck every 20 minutes.
Field tip: Subtract 5 minutes for wash-out and backing. Trucks need time to position behind the pump.
Concrete Delivery Interval Calculator Conversion Table
The table lists minutes between trucks by load size and placement rate.
| Rate (yd³/h) | Rate (m³/h) | 8 yd³ loads (min) | 9 yd³ loads (min) | 10 yd³ loads (min) |
|---|---|---|---|---|
| 10 | 7.6 | 48 | 54 | 60 |
| 15 | 11.5 | 32 | 36 | 40 |
| 20 | 15.3 | 24 | 27 | 30 |
| 30 | 22.9 | 16 | 18 | 20 |
| 40 | 30.6 | 12 | 14 | 15 |
| 60 | 45.9 | 8 | 9 | 10 |
| 80 | 61.2 | 6 | 7 | 8 |
What is the Concrete Delivery Interval Calculator?
The Concrete Delivery Interval Calculator is a spacing tool that returns the minutes between ready-mix trucks.
Trucks that arrive too fast wait and lose slump. Trucks that arrive too slow leave the crew idle and risk cold joints.
What are the uses of the Concrete Delivery Interval Calculator?
There are 3 pacing uses of the Concrete Delivery Interval Calculator, including pump pours and hand-placed slabs.
Pump pours
Foremen match trucks to pump output.
Hand-placed slabs
Crews pace trucks for wheelbarrow and chute work.
Hot-weather pours
Supervisors cut wait times in heat.
Method, Review & Sources
The Concrete Delivery Interval Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.
Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.
More Ordering & Delivery Calculators
View all 168 calculators →Concrete Waste Allowance Calculator
Add an entered waste percentage.
Concrete Over-Excavation Calculator
Calculate additional volume from enlarged excavation dimensions.
Concrete Order Rounding Calculator
Round yardage to a supplier’s order increment.
Concrete Shortfall Calculator
Compare required volume with available concrete.
Concrete Surplus Calculator
Calculate expected leftover concrete.
Concrete Delivery Reconciliation Calculator
Compare ordered, delivered, and placed volumes.