Concrete Delivery Reconciliation Calculator
Compare ordered, delivered, and placed volumes.
Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources
Concrete Delivery Reconciliation Inputs
Ordering & DeliveryFormula: Delivery variance = delivered − ordered; site loss = delivered − placed.
Estimated Result
- Delivery variance
- 0.00 yd³
- Placement yield
- 96.0%
How the Concrete Delivery Reconciliation Calculator Works
The Concrete Delivery Reconciliation Calculator compares ordered, delivered, placed, and returned volumes.
- 1
Enter ordered volume
Enter the volume ordered.
- 2
Enter ticket volume
Add the yardage on every delivery ticket.
- 3
Enter placed volume
Calculate placed volume from as-built dimensions.
- 4
Read variances
Read delivered vs ordered and placed vs delivered.
Concrete Delivery Reconciliation Calculator Formula
Reconciliation splits the difference into delivery variance and placement waste.
- Delivery variance
- ΔD = Vdelivered − Vordered
- Waste
- W = Vdelivered − Vplaced − Vreturned
- Waste %
- W% = W ÷ Vplaced × 100
Worked example: Ordered 30 yd³, delivered 30 yd³, placed 28.2 yd³, returned 0.5 yd³: waste is 1.30 yd³, or 4.6%.
Field tip: Keep every ticket. Tickets record batch time, volume, and water added, all needed for a dispute.
Concrete Delivery Reconciliation Calculator Conversion Table
The table reconciles 5 sample pours.
| Ordered (yd³) | Delivered (yd³) | Placed (yd³) | Returned (yd³) | Waste (%) |
|---|---|---|---|---|
| 10.0 | 10.0 | 9.4 | 0.25 | 3.7 |
| 20.0 | 20.0 | 18.6 | 0.50 | 4.8 |
| 30.0 | 30.0 | 28.2 | 0.50 | 4.6 |
| 45.0 | 44.0 | 42.1 | 0.75 | 2.7 |
| 60.0 | 60.0 | 56.3 | 1.00 | 4.8 |
What is the Concrete Delivery Reconciliation Calculator?
The Concrete Delivery Reconciliation Calculator is an audit tool that compares ordered, delivered, placed, and returned concrete.
Reconciliation separates supplier variance from site waste. Each number points to a different fix: ticket checks for delivery, grade control for placement.
What are the uses of the Concrete Delivery Reconciliation Calculator?
There are 3 audit uses of the Concrete Delivery Reconciliation Calculator, including invoice checks and waste tracking.
Invoice checks
Accounting matches invoices to placed volume.
Waste tracking
Managers track waste % across crews.
Supplier disputes
Contractors document short deliveries.
Method, Review & Sources
The Concrete Delivery Reconciliation Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.
Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.
More Ordering & Delivery Calculators
View all 168 calculators →Concrete Waste Allowance Calculator
Add an entered waste percentage.
Concrete Over-Excavation Calculator
Calculate additional volume from enlarged excavation dimensions.
Concrete Order Rounding Calculator
Round yardage to a supplier’s order increment.
Concrete Shortfall Calculator
Compare required volume with available concrete.
Concrete Surplus Calculator
Calculate expected leftover concrete.
Multiple-Pour Concrete Calculator
Total yardage across planned pours.