Skip to main content
Calculator Concrete Yards
Calculator Concrete YardsPro Volume Estimator
Ordering & Delivery

Multiple-Pour Concrete Calculator

Total yardage across planned pours.

Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources

Multiple-Pour Concrete Inputs

Ordering & Delivery

Formula: Total = sum of pours × (1 + waste).

Estimated Result

14.85 yd³
Total across pours (with waste)
Cubic feet
400.95 ft³
Cubic meters
11.35 m³
80-lb bags (0.60 ft³)
669 bags
60-lb bags (0.45 ft³)
891 bags
Net total
13.50 yd³

How the Multiple-Pour Concrete Calculator Works

The Multiple-Pour Concrete Calculator totals yardage across planned pours and shows each pour’s share.

  1. 1

    List pours

    List each planned pour by date or sequence.

  2. 2

    Calculate each pour

    Enter each pour’s dimensions.

  3. 3

    Add waste per pour

    Apply waste to each pour, since each pour has its own truck leftovers.

  4. 4

    Read the total

    Read per-pour and total yardage.

Multiple-Pour Concrete Calculator Formula

Total yardage equals the sum of each pour’s volume with its own waste.

Pour i
Vᵢ = Lᵢ × Wᵢ × (tᵢ ÷ 12) ÷ 27 × (1 + wᵢ)
Total
V = ΣVᵢ
Share
Shareᵢ = Vᵢ ÷ V × 100

Worked example: Footings 6.9 yd³, walls 26.8 yd³, and slab 13.1 yd³, each with 5% waste, total 49.14 yd³ over 3 pours.

Field tip: Apply waste per pour. Each pour leaves its own drum and pump-line leftover.

Multiple-Pour Concrete Calculator Conversion Table

The table splits a 5-pour house project with 5% waste per pour.

PourNet (yd³)With 5% (yd³)Share (%)Running total (yd³)
Footings6.907.2510.67.25
Walls26.8028.1441.035.39
Basement slab13.1013.7620.149.14
Garage slab7.107.4610.956.60
Driveway & walks11.4011.9717.568.57

What is the Multiple-Pour Concrete Calculator?

The Multiple-Pour Concrete Calculator is a project-level tool that totals concrete across 2 or more pour days.

A house uses 4 to 6 separate pours. Per-pour yardage drives each truck order, and the total drives the project budget.

What are the uses of the Multiple-Pour Concrete Calculator?

There are 3 scheduling uses of the Multiple-Pour Concrete Calculator, including pour schedules and budget tracking.

  • Pour schedules

    Superintendents plan trucks for each pour day.

  • Budget tracking

    Owners track concrete spend by phase.

  • Supplier commitments

    Contractors lock pricing on total volume.

Method, Review & Sources

The Multiple-Pour Concrete Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.

Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.

More Ordering & Delivery Calculators

View all 168 calculators →