Concrete Pour Allocation Calculator

Divide total volume among specified sections.

Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources

Concrete Pour Allocation Inputs

Ordering & Delivery

Formula: Each section gets total × its share of the combined area (equal thickness).

Estimated Result

12.00 yd³
Total allocated
Section A
5.33 yd³
Section B
4.00 yd³
Section C
2.67 yd³

How the Concrete Pour Allocation Calculator Works

The Concrete Pour Allocation Calculator divides a total volume among sections in proportion to their size.

  1. 1

    Enter total volume

    Enter the total yardage available or ordered.

  2. 2

    List sections

    List each section’s area or net volume.

  3. 3

    Compute shares

    Divide each section by the sum of all sections.

  4. 4

    Read allocation

    Read yardage per section.

Concrete Pour Allocation Calculator Formula

Each section receives total volume × its share of the combined size.

Share
pᵢ = Vᵢ ÷ ΣV
Allocation
Aᵢ = Vtotal × pᵢ
Check
ΣAᵢ = Vtotal

Worked example: 20 yd³ split over sections of 6, 9, and 5 yd³ net gives 6.00, 9.00, and 5.00 yd³.

Field tip: Allocate by net volume, not area, when sections have different thicknesses.

Concrete Pour Allocation Calculator Conversion Table

The table allocates a 30 yd³ (22.9 m³) order across 5 sections.

SectionNet (yd³)Share (%)Allocated (yd³)Allocated (m³)
Bay A6.2022.06.605.04
Bay B6.2022.06.605.04
Aisle8.4029.88.946.83
Dock apron5.1018.15.434.15
Ramp2.308.22.451.87

What is the Concrete Pour Allocation Calculator?

The Concrete Pour Allocation Calculator is a proportional split tool that assigns a total volume to each section of a pour.

Cost codes, phases, and multi-owner jobs need concrete charged to each section. Proportional allocation spreads waste fairly across sections.

What are the uses of the Concrete Pour Allocation Calculator?

There are 3 accounting uses of the Concrete Pour Allocation Calculator, including cost coding and shared-wall billing.

  • Cost coding

    Accountants charge concrete to each cost code.

  • Shared-wall billing

    Builders split costs between units.

  • Truck splits

    Foremen split 1 truck across sections.

Method, Review & Sources

The Concrete Pour Allocation Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.