Concrete Pour Duration Calculator

Estimate duration from volume and placement rate.

Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources

Concrete Pour Duration Inputs

Ordering & Delivery

Formula: Duration = volume ÷ rate + setup time.

Estimated Result

2.75 h
Total pour duration
Minutes
165 min

How the Concrete Pour Duration Calculator Works

The Concrete Pour Duration Calculator divides total volume by placement rate.

  1. 1

    Enter total volume

    Enter the pour yardage.

  2. 2

    Enter placement rate

    Use 10 yd³/h to 20 yd³/h for chute pours and 30 yd³/h to 80 yd³/h for pump pours.

  3. 3

    Add setup time

    Add setup and cleanup minutes.

  4. 4

    Read duration

    Read total hours.

Concrete Pour Duration Calculator Formula

Pour duration equals volume ÷ placement rate + setup time.

Placement
Tp (h) = V ÷ R
Total
T (h) = Tp + Tsetup + Tclean
Finish start
Finishing begins at bleed water loss, 1 to 4 h after placement

Worked example: 45 yd³ at 25 yd³/h takes 1.8 h to place. With 45 min of setup and cleanup, the pour runs 2.55 h.

Field tip: Start large slab pours early in hot weather. Morning pours give finishers more working time.

Concrete Pour Duration Calculator Conversion Table

The table lists placement hours by volume and rate.

Volume (yd³)10 yd³/h20 yd³/h40 yd³/h60 yd³/h
50.50.30.10.1
101.00.50.30.2
202.01.00.50.3
404.02.01.00.7
606.03.01.51.0
10010.05.02.51.7
20020.010.05.03.3

What is the Concrete Pour Duration Calculator?

The Concrete Pour Duration Calculator is a scheduling tool that returns how long a pour takes from first truck to last.

Pour duration sets crew size, pump rental hours, and finishing start times. A 100 yd³ slab takes 5 h at 20 yd³/h and 1.7 h at 60 yd³/h.

What are the uses of the Concrete Pour Duration Calculator?

There are 3 scheduling uses of the Concrete Pour Duration Calculator, including crew planning and pump rental.

  • Crew planning

    Foremen size finishing crews.

  • Pump rental

    Contractors book pump hours.

  • Inspection timing

    Inspectors schedule site visits.

Method, Review & Sources

The Concrete Pour Duration Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.