Skip to main content
Calculator Concrete Yards
Calculator Concrete YardsPro Volume Estimator
Ordering & Delivery

Concrete Truckload Calculator

Estimate loads using entered truck capacity.

Reviewed by Iqbal Hussain, site editor · Last reviewed ·Sources

Concrete Truckload Inputs

Ordering & Delivery

Formula: Trucks = volume ÷ capacity, rounded up.

Estimated Result

3 trucks
Truckloads
Last load
2.00 yd³

How the Concrete Truckload Calculator Works

The Concrete Truckload Calculator divides order volume by truck capacity.

  1. 1

    Enter order volume

    Enter the rounded order yardage.

  2. 2

    Enter truck capacity

    Enter capacity, commonly 8 yd³ to 10 yd³ (6.1 to 7.6 m³). Small trucks carry 3 yd³ to 4 yd³.

  3. 3

    Read truck count

    The calculator rounds trucks up.

  4. 4

    Read last load

    Read the size of the final partial load.

Concrete Truckload Calculator Formula

Truckloads equal the ceiling of order volume ÷ truck capacity.

Trucks
n = ⌈V ÷ C⌉
Full loads
nfull = ⌊V ÷ C⌋
Last load
Vlast = V − nfull × C

Worked example: 27 yd³ in 10 yd³ trucks takes 3 trucks: 2 full loads and a last load of 7.00 yd³.

Field tip: Put the partial load first or in the middle, not last. The last truck then tops off with a full drum.

Concrete Truckload Calculator Conversion Table

The table lists truck counts at 3 truck capacities.

Order (yd³)8 yd³ trucks9 yd³ trucks10 yd³ trucksLast load at 10 yd³
4.01114.0
9.02119.0
15.02225.0
22.53332.5
30.044310.0
45.06555.0
60.087610.0
100.013121010.0

What is the Concrete Truckload Calculator?

The Concrete Truckload Calculator is a load-count tool that returns how many ready-mix trucks a pour needs.

Standard mixer trucks carry 8 yd³ to 10 yd³ (6.1 to 7.6 m³), limited by axle weight. A full 10 yd³ load weighs about 40,000 lb (18,144 kg) of concrete.

What are the uses of the Concrete Truckload Calculator?

There are 3 logistics uses of the Concrete Truckload Calculator, including dispatch planning and site access checks.

  • Dispatch planning

    Plants schedule trucks for the pour.

  • Site access checks

    Builders plan truck staging and washout.

  • Delivery cost

    Estimators count trip charges.

Method, Review & Sources

The Concrete Truckload Calculator runs entirely in your browser. Every result comes from the formula shown above the inputs; nothing is rounded except bag and truck counts, which round up. Results are estimates for planning and ordering, not engineering advice: confirm dimensions on site and follow your plans, local code, and the product label.

Formula and inputs last checked on by Iqbal Hussain. Found an error? Report it.

More Ordering & Delivery Calculators

View all 168 calculators →